Customer Success Stories

Real Results from Real Manufacturers

See how leading manufacturers across industries are transforming their sales-to-production workflow with VIVAR.

FEATURED CASE STUDY

Rebrix

Modular Shelving | B2C

Challenge

Managed diverse module combinations with manual drawings, complex ordering process led to customer inquiry overload, frequent errors in production and installation reduced sales efficiency

Solution

Real-time pricing and quotation system with customized ordering platform through VIVAR 3D configurator

Rebrix product screenshot
850%
Revenue Growth
70%+
Lead Time Reduction
Real-time
Quote Generation
Automated
BOM Conversion

"With VIVAR, we now configure products and generate real-time quotes with customers, which helped us increase revenue by 850% and reduce lead time by over 70%."

Taewoung Kim
Taewoung Kim
CEO

More Success Stories

SAMOO logo
Interior Space Design

SAMOO

Challenge

Initial consultation required 5 meetings and 3 weeks for floor plan design

Solution

VIVAR-powered automatic design with real-time quotations

Meetings Required5 → 0
Design Time3 weeks → Real-time
Floor PlansInstant
Automated workflow
Total Impact
DK Dongshin logo
Appliance Materials

DK Dongshin

Challenge

7 days required for appliance exterior design visualization

Solution

Real-time 3D visualization with AI image rendering in actual spaces

Design Time7 days → Real-time
Delivery Rate Increase73%+
Space RenderingAI-powered
73% higher delivery
Total Impact
EV&SOLUTION logo
Electric Special Vehicles

EV&SOLUTION

Challenge

Complex container customization with legal compliance requirements

Solution

3D customization with mm-level precision, real-time quotes, and weight calculation

Configuration Accuracy99.9%
Faster Proposals3x
Legal ComplianceAutomated
99.9% accuracy
Total Impact
CUZCO logo
Interior Systems

CUZCO

Challenge

7 days required for floor plan production and installation coordination

Solution

3D preview with automatic BOM conversion and installation drawing generation

Drawing Production7 days → 5 min
Consult to Quote< 1 hour
BOM ConversionAuto
84x faster drawings
Total Impact
TOFAS logo
Modular Furniture

TOFAS

Challenge

Manual BOM creation and production coordination

Solution

Real-time 3D configuration with automatic BOM-to-robot production pipeline

Price UpdatesReal-time
Production BOMAutomated
Robot ControlDirect
Fully automated
Total Impact
LEGODT logo
Custom Tumblers

LEGODT

Challenge

Static online shopping experience with manual quote-to-order workflow

Solution

Interactive 3D tumbler configurator with physics engine and social sharing gallery

Part InteractionPhysics-based
Social SharingGallery
Order-to-InventoryAutomated
Enhanced UX + efficiency
Total Impact

Ready to Write Your Success Story?

Join 14 manufacturing companies across 6+ industries who have transformed their sales-to-production pipeline with VIVAR.

Book a Demo